Difference between revisions of "Deadline"

From Fancyclopedia 3
Jump to navigation Jump to search
(Bot: Automated import of articles)
 
 
Line 6: Line 6:
 
Theoretical time after which materials for a [[fanzine]] or a mailing cannot be accepted. Deadlines mean little with [[fanzines]], which almost invariably come out later than originally scheduled, anyway. In the [[FAPA]] a long, and on the whole successful, fite has been waged to get the mailings out on the dates specified.  
 
Theoretical time after which materials for a [[fanzine]] or a mailing cannot be accepted. Deadlines mean little with [[fanzines]], which almost invariably come out later than originally scheduled, anyway. In the [[FAPA]] a long, and on the whole successful, fite has been waged to get the mailings out on the dates specified.  
 
}}
 
}}
 +
 +
{{publishing}}
  
 
[[Category:fancy1]]
 
[[Category:fancy1]]
 
[[Category:fancy2]]
 
[[Category:fancy2]]

Latest revision as of 11:26, 24 December 2019

From Fancyclopedia 2, ca. 1959
The time after which no material is accepted for an APA mailing. Same after which no material is accepted for a given issue of a fanzine, hahahahaha. Deadlines mean little with fanzines, which almost invariably come out later than originally scheduled anyway; but in FAPA a long, and on the whole successful, fight has been waged to get the mailings out on the dates specified. For some particulars, see Blitzkrieg.
From Fancyclopedia 1, ca. 1944
Theoretical time after which materials for a fanzine or a mailing cannot be accepted. Deadlines mean little with fanzines, which almost invariably come out later than originally scheduled, anyway. In the FAPA a long, and on the whole successful, fite has been waged to get the mailings out on the dates specified.

Publishing