Difference between revisions of "Deadline"
Jump to navigation
Jump to search
(Bot: Automated import of articles) |
|||
Line 6: | Line 6: | ||
Theoretical time after which materials for a [[fanzine]] or a mailing cannot be accepted. Deadlines mean little with [[fanzines]], which almost invariably come out later than originally scheduled, anyway. In the [[FAPA]] a long, and on the whole successful, fite has been waged to get the mailings out on the dates specified. | Theoretical time after which materials for a [[fanzine]] or a mailing cannot be accepted. Deadlines mean little with [[fanzines]], which almost invariably come out later than originally scheduled, anyway. In the [[FAPA]] a long, and on the whole successful, fite has been waged to get the mailings out on the dates specified. | ||
}} | }} | ||
+ | |||
+ | {{publishing}} | ||
[[Category:fancy1]] | [[Category:fancy1]] | ||
[[Category:fancy2]] | [[Category:fancy2]] |
Latest revision as of 11:26, 24 December 2019
From Fancyclopedia 2, ca. 1959 |
The time after which no material is accepted for an APA mailing. Same after which no material is accepted for a given issue of a fanzine, hahahahaha. Deadlines mean little with fanzines, which almost invariably come out later than originally scheduled anyway; but in FAPA a long, and on the whole successful, fight has been waged to get the mailings out on the dates specified. For some particulars, see Blitzkrieg. |
From Fancyclopedia 1, ca. 1944 |
Theoretical time after which materials for a fanzine or a mailing cannot be accepted. Deadlines mean little with fanzines, which almost invariably come out later than originally scheduled, anyway. In the FAPA a long, and on the whole successful, fite has been waged to get the mailings out on the dates specified. |
Publishing |