Difference between revisions of "Lead Time"

From Fancyclopedia 3
Lead Time
Jump to navigation Jump to search
(Bot: Automated import of articles)
 
m (Text replacement - "Category:conrunning" to "{{conrunning}}")
Line 1: Line 1:
 
"Lead time" in the context of [[site selection]] is the number of years between a [[bidded convention]] being selected and actually occurring.  Tweaks to [[Worldcon site selection]] have adjusted the [[Worldcon]] lead time from one year to two years to three years and then back to two years.  See also [[rotation plan]].
 
"Lead time" in the context of [[site selection]] is the number of years between a [[bidded convention]] being selected and actually occurring.  Tweaks to [[Worldcon site selection]] have adjusted the [[Worldcon]] lead time from one year to two years to three years and then back to two years.  See also [[rotation plan]].
  
[[Category:conrunning]]
+
{{conrunning}}

Revision as of 03:43, 14 February 2020

"Lead time" in the context of site selection is the number of years between a bidded convention being selected and actually occurring. Tweaks to Worldcon site selection have adjusted the Worldcon lead time from one year to two years to three years and then back to two years. See also rotation plan.


Conrunning
This is a conrunning page.